June-October 2024 Refit

June 2024

               Replaced 1 gallon shower sump with 3 gallon shower sump

               Conducted routine generator maintenance (98 hours)

                              Changed oil and oil filter

                              Changed primary and secondary fuel filter

                              Replaced generator zinc

                              Submitted oil sample for analysis (result: normal)

               Conducted routine maintenance on engines

                              Changed oil and oil filters

                              Primary and secondary fuel filters

               A/R Diesel conducted full maintenance on fuel injectors

               Installed Starlink

July 2024 — MTS reconfigured port and starboard putlet switches to run off of inverter

Oct 2024 –Identified problem with electrical overload

Sep 28 to Nov 1 –Elena visited Russa and Turkey

Nov 2024

Payless washed and wax hull and topsides

Phipps installed two new head discharge seacock

Phipps replaced 8 feet of sanitation hose

Phipps manufactured and installed stainless steel plate under bow sprit

Nov 2024 –Master Air Conditioner stopped working.  Shiver Me Timbers replace display control unit

Leave a Reply

Your email address will not be published. Required fields are marked *